we've been engaged in production of traffic lights for 6 years and have exported our products to over 90 countries worldwide. The moulds of housing are all developed by ourselves and thus we have advantage in price. Even more , we can offer first-rate service to customers.
1.4 Do you accept OEM?
Yes, this is our regular cooperation and business. We accept producing products under Clients' brands.
1.5 Do you accept third party inspection?
We accept the buyer's request of inspection by third parties, such as SGS, B.V., COTECNA, etc. but the total charges related shall be on buyer’s account or Shared.
2. Trade Terms:
2.1 How do you make a price offer and how long is its validity?
Price offer is based on customer's particular order, agreed payment terms, and actual cost. Usually,the offer is valid for 15 days.
2.2 How can we get samples from you ?
Yes, this is our regular cooperation and business. We accept producing products under Clients’ brands.
2.3 What if quality or quantity discrepancy arises?
In case of quality discrepancy, claim should be filed by the Buyers within 30 days after the arrival of the goods at port of destination.
For quantity discrepancy, claim should be filed by the Buyers within 15 days after the arrival of the goods at port of destination.
If there are discrepancy not specified in the contract, we should negotiate directly or resort to the arbitration or legal activities.
2.4 What payment terms do you accept?
--- We prefer confirmed 100% irrevocable letter of credit payable at sight;
--- Possibly T/T 30-50% of total amount as down payment before shipment and left balance before releasing documents;
....All by T/T before shipment, especially for the case that the total deal amount is small.
--- some other payments are also welcome if the amount is very small, such as Paypal, Western Union, etc.
2.5 Delivery and Transit Time:
If
the indent is given and for one full container load, the proper time
for shipment of regular types of westrooper products is usually 10-20
days after receipt of L/C or T/T down payment.
Transit Time:
Transportation Mode
Destination
Transit Time
By sea
(from China Main Ports)
Hongkong / Japan / Korea
3 days
European Main Ports
25~30 days
Black Sea Countries
30~35 days
Middle East
15~20 days
American West Ports
12~14 days by express vessel;
28~30 days by common vessel
American East Ports
40~45 days
Oceania Countries
15~20 days
By Railway or Multi-model Transportation
Countries along the Eurasia
Continental Railway Line
35 days to Moscow
Note:
Shipment schedule may be delayed during the MAIN holidays in China, i.e.:
Spring Festival holiday: usually in January/February
Labor Day Holiday: May 1st to 3rd
National Day holiday: Oct. 1st to 7th
2.6 What is the minimum order quantity for traffic light products?
Minimum order quantity depends on a particular product - usually 10pcs. In case of orders for smaller quantity we charge additional fees.
At the meantime, we also have several warehouses, each kind of regular products has 10 sets in stock. if you need small quantity like several pieces for a try, it is also available for us to deliver you.
3. Product Technology:
3.1 Whether the 8'' (200mm*200mm),12'' (300*300mm) lamp have square and round?
At present does not have square, 400mm we have square.if you have the special request, please feel free to contact us.
3.2 Whether or not the basic unit replace the incandescent directly (the traffic signal light is light bulb)?
So long as in the normal working voltage scope (rated voltage in ±20%), the housing may match with our bulb directly, then replace directly.
3.3 Whether the working voltage only are 110v and 220v two kinds, other working voltage can use?
Working voltage are 110v and 220v, still working when the voltage in the ±20%, the 110v lamp, it can be working when the voltage in the 85V~135, the function have not different.